Back in July when we purchased the building next door we hoped that our project to connect the two buildings would be complete by the time it was really cold and snowy. After investigating our options to join the facilities we discovered that much of the cost was in the foundation and decided that a 2500 square-foot addition connecting the two shop areas would give us the best overall value. This allows us to continue to grow at this location for the next 10 years and there is room for future shop expansion if necessary. After months of back and forth between our builder and the township we finally had an approved set of plans in late December.

I am happy to say that we have made significant progress in the last six weeks and below are some pictures showing the progress. We hope to start using the building sometime in April.

building_expansion_1.png

building_expansion_2.png

building_expansion_3.png

building_expansion_4.png

Matt Eurich is the president of Wineman Technology.

 

Topics: News